Southampton Cruise Terminal

Southampton Cruise Terminal

CLIENT / CONTRACTOR:
JOHN GRAHAM CONSTRUCTION LTD
VALUE:
£360,000.00

The aim of this project was modification works to accommodate the increasing size of cruise ships at the berths, and additional passenger flows in the terminal building.  Further key elements of the scheme included the construction of a new entrance lobby, alteration of the terminal building to provide an improved and additional vertical transition and the expansion of the security X-ray area.

Our works included: Baggage Pod 4, Lobby, Walkway, X Ray Pod and Drop Off Canopy.